Mission

As a utility service provider our mission is to operate, maintain, plan, and develop the Town’s water and wastewater systems and ensure all work is performed in accordance with State and Federal Permit Requirements and Regulations. We will responsibly treat, store, and distribute water to meet the social, heath, economic and environmental needs of the community in a cost efficient manner. Similarly we will ensure that the wastewater system and force mains which collects and transports the Town’s wastewater to the GLSD is sound and operating effectively.

 

Description

The Canobie Lake Water Treatment Plant (WTP) provides over 7,700 homes and businesses with water and produced over 874 million gallons of water in 2016 with an average production of 2.4 million gallons per day(MGD). The facility has the capacity to provide up to 6.0MGD and was designed and built to comply with EPA’s Safe Drinking Water Act and Surface Water Treatment Rule. In 2016 all State and Federal Drinking Water standards were met or exceeded. A public notice was required by NHDES to be sent out after a late reporting of our October sampling. Along with the WTP, the Utilities Division also operates and maintains two water booster stations and the Arlington Pond Pump Station. Three dam locations are also monitored in order to maintain established levels in their respective water bodies. Water supply is critical to the health and wellbeing of our community and production of safe drinking water remains our number one concern.

As for the waste water systems, responsibilities include the maintenance and repair of the collections system which is approximately 60 miles of piping, hundreds of manholes, and 10 pumping stations located throughout the community. The Sewer system delivers 5 million gallons of flow on an average daily basis with peak hourly counts reaching 14.5 million gallons to the Greater Lawrence Sanitary District (GLSD). The collection system is maintained in the most practical manner to ensure service and reliability and is monitored to identify illicit flows. There is a significant cost and reserved capacity for flow to the GLSD so it is important that any and all deficiencies including inflow and infiltration (I/I) are determined so a budget number for repair can be incorporated into capital planning. The Board of Selectmen adopted the Sewer Master Plan Update by Underwood Engineers in June 2017.